Supervision

The monitoring unit of the four disciplines of civil engineering, architecture, electricity and mechanics under the Mehraz Shahreranian construction consulting company assures that by relying on and mastering theoretical, experimental knowledge, it will accept all legal responsibilities from the beginning to the end of the project alongside the respected owners. is .

Theoretical knowledge with reference to;

  • A – Experienced personnel

  • B- Grade of the company from the program and budget organization of the country.

  • Empirical based on the completed projects from the stage of demolition to the completion of the work and the issuance of a separate document from the Shur Property and Deeds Registration Organization, which is stated in the company’s resume.

  • Ensuring the financial and time aspects in coordination with the project control engineer and suggestions to the design company for new materials and details with high execution speed and the executive team accelerate this with monthly reports to the owner and executive.

  • Acceptance of all legal responsibilities from demolition and excavation to exploitation and obtaining the end of the work in financial compensation is paid based on the value of the contribution of the monitoring device.

Duties of the monitoring body

Supervision is the highest authority available to advance the project.

which is in accordance with the legal regulations, safety and other technical regulations in the field of construction (from bodies including; approved phase and design plans of the consultant (designer) – minutes of meetings of the supreme supervision and the consultant – approved laws of the engineering system – municipal or village laws and fire department – laws and the approvals of the country’s program and budget organization – the laws of the country’s documents and real estate registration organization) which has assigned the relevant responsibility to the executive, the employer by preparing regular reports and has the duty of ensuring the correct implementation and compliance with the standards and laws related to the building and has an important contribution It includes the following steps in controlling and compensating financial and life damage;

مجتمع مسکونی فرهیختگان 1

Before construction:

Demolition of the previous building (if needed), excavation, construction of pithans and basic facilities.

During construction:

The supervisor must make sure that the building is built according to the plans and technical standards and that all the construction steps are done correctly;

implementation supervision;

Consolidation of the soil bed (with various materials based on the climate) – prediction of earth and burial wells related to the shoes of negative floors and drainage behind the retaining wall – prediction of pits; Sewage septic tank, water source, Alimak foundation or tower – mapping of structure points – leveling of concrete except concreting – structure control; Alignment, openings, overlaps, verticality, layout, etc.; Reinforcement, formwork, concreting or installation of welded or bolted skeleton – coiling of walls – frames of openings – walling – installation of facilities on the floor and ceiling – flooring – thin work inside and outside, etc.

quality control of materials;

The construction inspector must check the construction materials provided to ensure the quality and compliance with the relevant standards.

Safety monitoring:

Ensuring the implementation of all safety regulations in the building including fire fighting, emergency exit and safety equipment against fire and other safety threats.

Energy consumption monitoring:

To ensure the implementation of energy consumption regulations and the use of energy efficient equipment.

Supervision of employees and contractors:

Examining the skills and commitment of employees and contractors in project implementation.

end of work:

Final inspections of the project and ensuring the correct and complete implementation of all components of the building and facilities in order to obtain the completion of the work and hand it over to the municipality and finally to the Registration of Deeds and Real Estate Organization to issue a single-page document separating all the units, whether residential, commercial, administrative, etc. ..